THE MAGNETITE ORE PROCESSING PROJECT IN GUA MUSANG, MALAYSIA

Processed Material:  Magnetite Ore

Mine Method:   Surface

Product Size:   0-10,10-50mm

Work Time:   10h

Ore Density:   2.6t/m³

Capacity:   4500t/d

Grade:   53.8%

The evaluation by customer: Because of our high requirements for final particule granularity, I have followed the views of LIMING engineer with a two-stage crushing - a PE Jaw Crusher for primary crushing and two Hydraulic Cone Crusher HST160 for secondary crushing. Quite stable performance, also the production makes me satisfied. To my most pleasant surprise, the intelligent operation of machine has saved me a lot of time and also costs.



INFO REQUEST

Thank you for your interest in LM Heavy Industry. If you want to learn more about our Crushers and Industrial grinding mills, Contact us Now to find out what we can do for you next project !

  • Daunia Coal Mine, Queensland, Australia - Bechtel

    Bechtel provided engineering, procurement, construction, and management services for the Daunia coal mine in Australia. The Hub model enabled Bechtel and its customer to work together directly in a planned long-term arrangement to save money and time, improve safety and quality, reduce risk and facilitate better 

  • The role of contract mining in the resources industry - CIMIC Group

    Aug 6, 2009 A brief outline of the Leighton Group and our role in the mining industry. [Slide 2: Divider - The minerals . The scope of a mining contract will be defined and agreed between the client and the contractor and . The contract works includes the removal of overburden and mining of the coal, plus provision of 

  • Hydrogeological Study for the Setlabotsha Coal Mine Project

    Hydrogeological Study for the Setlabotsha Coal Mine Project. Project Number: Delh.2015.027-2. Document Information. Report Version. Draft Report. Reference Number. Delh.2015.027-2. Author(s). Martin Holland. Document Reviewer. Kai Witthüser. Client Contact. Suzanne Van Rooy, Beth Candy. Date. June 2016.

  • Basin Mine Development – Arthon

    The open pit coal mine had an anticipated yearly production of 500,000 tonnes of thermal coal. The development of the Basin Mine had a capital cost of $30M. It began in 2011 and ended in the fall of 2013. Scope of Work. Arthon provided the following construction services for the Basin Mine development: Haul road 

  • Coal Mining Jobs Mining Employment - Careermine - InfoMine

    Coal Search 1000's of active mining jobs including engineering and geology jobs. New jobs daily. work areas as needed and other work associated with the daily operation of a surface coal mine. Colstrip, Montana, USA . Coal board medical Section 4 Standard 11 Statement of Attainment Passport or (Birth certifie.

  • Preparatory works agreement for Byerwen project - MAH Investor

    May 15, 2017 Macmahon and Byerwen are now in the process of negotiating the final mining services contract for the. Byerwen Coal Mine. The scope of work for this contract is expected to include open cut mining and bulk earthworks for an initial period of three years, with total material movement expected to be in the 

  • Construction work at coal workplaces and mining workplaces - NSW

    Sep 1, 2008 legislation relating to construction work applies at NSW coal and mining workplaces. SCOPE. What legislation applies to construction work? The Occupational Health and Safety Act 2000 (OHS Act) and Occupational. Health and Safety Regulation 2001 (OHS Regulation) set out duties that must be followed 

  • citizen's guide to indiana's abandoned mine lands program - IN.gov

    OSMRE is a federal agency within the Department of Interior which is responsible for overseeing each state's coal mine reclamation program. Each year the State of Indiana receives an alloion of funds from the federal government. After a site is determined to be eligible for. AML reclamation, a scope of work is prepared 

  • Mt Arthur Coal - BHP Billiton

    Sep 12, 2014 Arthur Coal Mine Underground Project. It should be noted that the Mt Arthur. Underground Project (Project Approval 06_0091) had not commenced at the time of the audit and was not therefore included in the audit scope of works. Statements of compliance reported in this audit report are only related to the 

  • The role of contract mining in the resources industry - CIMIC Group

    Aug 6, 2009 A brief outline of the Leighton Group and our role in the mining industry. [Slide 2: Divider - The minerals . The scope of a mining contract will be defined and agreed between the client and the contractor and . The contract works includes the removal of overburden and mining of the coal, plus provision of 

  • Construction work at coal workplaces and mining workplaces - NSW

    Sep 1, 2008 legislation relating to construction work applies at NSW coal and mining workplaces. SCOPE. What legislation applies to construction work? The Occupational Health and Safety Act 2000 (OHS Act) and Occupational. Health and Safety Regulation 2001 (OHS Regulation) set out duties that must be followed 

  • Activities - Sustainable Energy - UNECE

    The work of the Group of Experts on Coal Mine Methane (CMM) has a benefit for coal mine safety through improvements in the drainage, recovery and use of of Experts' scope of work to cover integrated methane management in the context of sustainable development; Continue to provide advice on coal mine methane 

  • Watching for Jobs at the New Acland Coal Mine Stage 3 Project

    Apr 10, 2016 Subject to the Mining Lease being approved,construction should commence towards the end of 2016. Scope of work includes: Coal Handling and Preparation Plant;; Materials Handling Facility;; Optional Overland Conveyor;; Train Load-out and Rail spur and loop; and; Civil works and offsite infrastructure.

  • mining services - SRK Consulting

    Project: Coal exploration management, Barito Basin, Kalimantan,. Indonesia. Scope: Based on successful due diligence work on the Rantau Nangka coal project in southern Kalimantan,. SRK provided JORC- compliant exploration management for the client. Outcome: SRK refined coal exploration targets within the large 

  • MSJ Coal Mine - CIMIC Group

    Leighton Asia* has been operating at the MSJ coal mine since 2004, when it signed an initial three-year contract. The scope of work for the extension has been increased since August 2007, requiring Leighton to produce almost eight million tonnes of coal over a three-year period. Leighton Asia is responsible for the open 

  • Outline for scope of work for Yorkshire Coalfield Rising Mine Water

    The Coal Authority. Outline for scope of works. Yorkshire Coalfield. Rising Mine Water Assessment. June 2014. Coal Authority Reference: CA18/2311 Instr. 121 (Procurement). CA08/20/3/239/3 (Wisdom Loion). Introduction. The Yorkshire Coalfield covers a large area (approx. 3000km2) extending from the North.

  • UNSW Handbook Course - Coal Mine Design and Feasibility Project

    Due to the scope of work involved, the project is undertaken by teams of students. The teams are required to prepare and present a feasibility study of a mining project. Teamwork, project management and presentations skills are assessed in addition to the technical analysis and content of the final feasibility study.

  • Management Consulting - Mining and Energy , Norwest

    Western Coal Corporation retained Norwest to conduct due diligence regarding Western Coal's cash/share transaction to combine with Walter Energy Inc. Norwest's scope of work included conducting due diligence on Walter Energy's operations including two underground longwall mines, certain surface operations, a coke 

  • Coalspur Vista Mine , CIF Construction Ltd.

    Unique features: Situated East of Hinton, AB, Alberta's newest coal mine is in the construction phase. Coalspur's primary goal is to complete construction of a coal preparation plant capable of processing 2400 tonnes per hour within the first quarter of 2018. CIF's scope of work consists of large concrete foundations and piers